Read The Times Australia

Daily Bulletin

Bridge Data Centres and Morong Electric Jointly Launch the World’s First Fully Prefabricated Power Module for AI Data Centres

Called PowerCore 5.0, the containerised module will reduce power infrastructure delivery timelines by more than 50%.

SINGAPORE - Media OutReach Newswire - 6 August 2026 - Bridge Data Centres (BDC), a Singapore-headquartered hyperscale data centre provider, and Morong Electric, an electrical manufacturing specialist, have launched PowerCore 5.0, the world's first fully prefabricated power module designed for high-density AI data centres.

BDC
BDC's Power Core 5.0 module

Built for high-density AI workloads on accelerated deployment timelines, the module complies with the technical standards of BDC's proprietary i-Power Cube, its power system designed for high-performance computing. It integrates seamlessly with the Bridge Omni Platform, BDC's modular intelligent infrastructure platform for the AI era. PowerCore 5.0 combines BDC's global hyperscale delivery experience with Morong Electric's end-to-end electrical manufacturing expertise.

Rapid AI advancement has driven rack power densities from 10kW to more than 100kW, placing stringent new demands on mission-critical power infrastructure. Traditional delivery models, which rely on fragmented procurement and on-site system integration, struggle to cater to the rigorous requirements of AI-optimised data centres. Drawing on BDC's global campus delivery footprint and Morong Electric's electrical engineering expertise, PowerCore 5.0 addresses these challenges through four core design attributes: factory pre-integration, standardised global transport, parallel construction and maintenance without downtime.

Factory pre-integration

Each unit integrates transformers, power distribution, uninterruptible power supply (UPS), cooling, fire suppression and monitoring systems into a single module, fully assembled and tested off-site. Site teams need only complete the final cable connections on delivery, removing the quality inconsistencies that accompany conventional field construction.

Standardised global transport

Built on a standard 40ft ISO container frame, the module integrates seamlessly with global shipping networks, eliminating oversized freight premiums, dedicated transport and protracted customs delays that hinder cross-border deployments. Purpose-engineered for BDC's core markets, it complies with local climatic benchmarks and industrial standards to enable dependable global rollout.

Shortened delivery timelines by more than 50%

On-site civil works and factory prefabrication proceed simultaneously, shortening total delivery timelines by more than 50% compared with conventional build methods[1]. Large campuses can deploy units on a bi-weekly cadence, matching the rapid scaling and flexible capacity expansion that AI demands.

Maintenance without downtime

In an industry first, core components including UPS units, transformers and precision cooling are mounted on slide-out rails. Technicians can withdraw and service individual units without interrupting power to the data centre, keeping high-density compute clusters running around the clock.

Mr Zhang Binghua, Chief Technology Officer of BDC, said, "The AI infrastructure sector is scaling at an unprecedented rate, and operators now require higher power density, faster hardware refreshes and maximum uptime. This shift requires us to rethink how power systems are designed and deployed. PowerCore 5.0 raises the bar on system integration, cross-climate operation, delivery speed and intelligent operations and maintenance. It will enable standardised, low-carbon compute deployments across the globe and provide the stable power foundation to support the continued growth of the global AI ecosystem."

Mr Zhang Kai, Chairman of Morong Electric, said, "AI hardware now evolves on a monthly cycle, and traditional on-site system integration can no longer keep pace with the operational needs of modern AI data centres. Prefabricated power modules clear the delivery bottlenecks holding back compute infrastructure expansion. This launch marks a critical milestone in our strategic partnership, and we will continue to co-develop high-performance, integrated power solutions that meet global market standards and regional compliance requirements."

BDC and Morong Electric will continue to develop prefabricated power modules engineered for ultra-high-density compute and cross-border regulatory alignment. Both companies aim to advance industry-wide technical standardisation and the collaborative development of compute infrastructure. Their low-carbon, modular power solutions will support the sustainable and scalable growth of AI operations across international markets.


[1] Conventional build methods typically deliver power modules on a monthly cycle. PowerCore 5.0 is delivered on a bi-weekly cycle.


Hashtag: #BridgeDataCentres

The issuer is solely responsible for the content of this announcement.

About Bridge Data Centres

Bridge Data Centres (BDC) is a Singapore-headquartered hyperscale data centre provider delivering high-performance, next-generation digital infrastructure across Asia Pacific. Backed by Bain Capital, BDC operates in Malaysia, Thailand, India, and other high-growth markets, with the capability to deliver up to 3 gigawatts (GW) of capacity globally by 2030 through partnerships with sister platforms in Europe and the United States.

About Morong Electric

Morong Electric is a power solutions provider for AI data centers worldwide and a developer and manufacturer of modular AI data center infrastructure products. Its PowerCore 5.0 is a Factory-built AI Infrastructure product system spanning core product lines including GridHub (medium-voltage intake), RingNode (medium-voltage ring network), GridBlock (core power transformation and distribution), and EnergyVault (backup energy). Guided by the principles of modular data centers, productized design, global standardization, elastic scalability, factory-grade smart manufacturing, rapid deployment, and integrated intelligent control, Morong Electric is committed to advancing power infrastructure for the AI computing era through industrialized mass production.

Business News

The Rise of Digital Marketplaces in the Australian Trade Sector

For decades, the Australian trade and construction sector operated almost entirely on word-of-mouth recommendations and local community networks. Small business owners typically relied on local newspa...

Daily Bulletin - avatar Daily Bulletin

How Immigration Lawyers Can Help

Introduction Visa decisions can shape employment, family life, study plans, travel, and future residence. A small omission can lead to delay, added expense, or refusal. Immigration lawyers assess l...

Daily Bulletin - avatar Daily Bulletin

How Industrial Drying Equipment Supports Efficient Processing

Many industrial processes require moisture to be removed from compressed air, products or process materials before they move to the next stage. Excess moisture can affect equipment performance, produc...

Daily Bulletin - avatar Daily Bulletin

Practical Ways a Whiteboard Can Improve Workplace Communication

Effective communication helps teams stay organised, share ideas and keep track of important information. While digital tools are now common in many workplaces, a whiteboard continues to provide a simp...

Daily Bulletin - avatar Daily Bulletin

Designing Eco-Friendly Custom Water Bottles for Your Next Event

The Evolution of Sustainable Event Merchandise Event planning has undergone a massive transformation over the last decade. Gone are the days when organizers could hand out cheap, single use plastic...

Daily Bulletin - avatar Daily Bulletin

Why Choosing a Professional Florist Melbourne Makes Flower Delivery Impactful

Flowers have a great power to speak when humans cannot express their feelings with right words. Flowers are the best gifts when you are celebrating a birthday or welcoming a newborn child into your fa...

Daily Bulletin - avatar Daily Bulletin

The Business Case for Choosing Australian Fabricators Over Imported Alternatives

For a long time, you might have defaulted to overseas suppliers when sourcing fabricated metal components for a project. The unit price was lower on paper, and the maths seemed straightforward. That...

Daily Bulletin - avatar Daily Bulletin

Australian organisations are relying on business continuity plans built for a far more predictable world

Tariff escalations, supply chain fragility, geopolitical events, and the ongoing threat of cyber disruption have reshaped the risk environment facing Australian organisations. The problem is that ma...

Daily Bulletin - avatar Daily Bulletin

How to Rent a Car for Uber in Melbourne: What Every New Driver Needs to Know

Starting out as an Uber driver in Melbourne is not as complicated as it sounds but getting the vehicle right is where most new drivers get stuck. Uber has strict requirements around vehicle age, condi...

Daily Bulletin - avatar Daily Bulletin

The Daily Magazine

How to Ensure Safe and On-Time Building Material Delivery with Sydney Cargo Transportation Services

Managing a construction site requires precise coordination, where even a minor delay can stall an en...

What to Ask Your Cosmetic Surgeon About Liposuction and Thigh Lift Reduction in Perth

Establishing the Surgeon’s Credentials and Local Experience Your safety depends heavily on the cred...

Top Ergonomic Tips to Enhance Your Neck Pain Treatment and Prevent Back Pain In Sydney

Many office workers in New South Wales spend upwards of eight hours a day hunched over a keyboard, l...

What to Ask Your Hire Specialist Before Booking Commercial Vehicles Inter-State

Planning a long-haul commercial trip across Australia requires more than just booking a vehicle an...

What Candidates Should Do Before and After Non-Surgical Skin Tightening in Melbourne

Achieving firm, youthful skin no longer requires invasive surgery or lengthy downtime. Melbourne res...

How to Prepare Your Skin for Laser Treatments in Brisbane and Gold Coast

Achieving radiant, clear skin often leads people to consider advanced clinical procedures. If you ar...

How Labour Gaps Delay Residential Building Projects

A residential build rarely stalls because of one dramatic event. More often it stalls because the ri...

Reducing Sales Content Management Complexity Through Structured Systems

Sales content can quickly become difficult to manage as a business grows. Product descriptions, pitc...

Stainless Steel Supplier: Finding the Right Materials for Your Project

Why the Choice of Supplier Matters The supplier you choose can affect the quality and progress of...